DSpace
 

Defence Technology Institute Repository >
เอกสารวิจัย >
ผลงานด้านการวิจัยและพัฒนานวัตกรรมและเทคโนโลยีป้องกันประเทศเพื่อนำไปสู่อุตสาหกรรมป้องกันประเทศ >

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/1935

Title: Simulation modeling to increase production capacity from prototype to production: A case study of rocket motor parts manufacturing plant
Authors: Panyaphirawat, Tosapolporn
Pornyungyuen, Teeratas
Sapsamarnwong, Pairoj
Issue Date: 2015
Publisher: Defence Technology Institute
Series/Report no.: 58044;
Abstract: In manufacturing industry, a newly developed product shall go from a stage of research and de-velopment to preliminary design, detailed design and prototyping in order to reach a final goal of mass pro-duction. In general, during designing and prototyping phase, the product is produced in a small amount only for test and verification. Once the design is approved and all manufacturing processes are verified, only then will the product be produced in a large quantity to deliver to customers. For this reason, a production line for prototyping and mass manufacturing is normally set up differently with regard to a number of parts pro-duced. In this study, a simulation modeling by ARENA simulation software is used to investigate and ana-lyze the required resources in order to increase production capacity from prototyping phase to production phase of a rocket motor parts manufacturing plant.
Description: บทความวิจัย
URI: http://hdl.handle.net/123456789/1935
Appears in Collections:ผลงานด้านการวิจัยและพัฒนานวัตกรรมและเทคโนโลยีป้องกันประเทศเพื่อนำไปสู่อุตสาหกรรมป้องกันประเทศ

Files in This Item:

File Description SizeFormat
58044I_abs.pdf110.45 kBAdobe PDFView/Open
View Statistics

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback