Defence Technology Institute Repository >
เอกสารวิจัย >
ผลงานด้านการวิจัยและพัฒนานวัตกรรมและเทคโนโลยีป้องกันประเทศเพื่อนำไปสู่อุตสาหกรรมป้องกันประเทศ >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/123456789/2029
|
Title: | DTI'S MODELING AND SIMULATION INITIATIVE PROJECT TO STRIVE FOR |
Authors: | Kumsap, Chamnan Witheetrirong, Yongyoot Pratoomma, Prakorn |
Keywords: | disaster crisis management standard HADR simulation and simulator project initiative |
Issue Date: | 2016 |
Publisher: | Defence Technology Institute |
Series/Report no.: | 5982; |
Abstract: | Military operations other than war have been put ahead
of missions in battlefield in time of resource scarcity
and disaster crisis management. Defence Technology
Institute or DTI was established to conduct large-scale
and nation-wide research and development projects with
great impact at national scale. This paper reports an
initiative of research and development to prepare the
nation for earthquakes, flooding and landslides that
have effected Thailand and inevitably led the world
economy to numb, taking the 2011 Thailand major
floods as an example. An HADR simulation and
simulator project was initiated to prepare a ready hand
of Thailand's armed forces, non- and governmental
organizations, academic institutes and even private
sectors to cope with the crisis. Modeling and simulation
are embraced as a tool to predict the disasters. Standard
Operating Procedures of best practices from actual and
frequent experiences are input for the method
development and incorporation with Thai own SOPs in
response to the eruption. Similarly, records, mistakes
and success are analyzed in the modeling and
simulation research that fits Thailand’s situation and
come up with Thailand’s SOPs to recover victims or
effected people from the disasters. Sharing resources
and knowledge, involving indigenous academia,
creating forum and bringing in foreign expertise are
media that will place DTI in the middle of disparate
stakeholders where project management takes control.
Three years are a major constraint that the project needs
project management for cooperation, collaboration and
integration. High success has been expected so that
feasibility study with the demonstration of one sample
disaster scenario is minutely planned to acquire foreign
outsourcing. Targets are set to ensure and secure budget
in from of formal and promised user requirements.
Deliverables are set at the end of three consecutive
fiscal years. |
Description: | บทความวิจัย |
URI: | http://hdl.handle.net/123456789/2029 |
Appears in Collections: | ผลงานด้านการวิจัยและพัฒนานวัตกรรมและเทคโนโลยีป้องกันประเทศเพื่อนำไปสู่อุตสาหกรรมป้องกันประเทศ
|
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
|